Wednesday, July 12, 2006

Day 4 of Pool Construction

Today they installed french drains around the pool to reduce the pressure of ground water, began to backfill around the outside of the pool, and removed some of the excess dirt from our yard.

1 Comments:

Anonymous Anonymous said...

I love being able to watch this. Thanks for posting it.

7/13/2006 02:14:00 PM  

Post a Comment

<< Our Blog